Migrate to CockroachDB with a certified partner.
Distributed SQL solves the resilience problem your legacy database could not. It does not solve the operational one, and it introduces new failure modes that a single-node estate never had. Maxima converts the schema, rebuilds the ETL, rehearses the cutover, and then runs the cluster 24/7 inside your own account.
Get your CockroachDB migration and operations assessmentCMMI Maturity Level 3 appraised
24/7/365 follow-the-sun SRE from Kraków and Pune
Akamai Cloud Compute Services Partner of the Year
Operating for complex industries since 1993
Why teams are moving to distributed SQL
What can go wrong when you migrate to CockroachDB
How we approach it: Five phases, one accountable team
Phase 0: Assessment and conversion report.
A read-only pass over the real schema. Every object classified: converts automatically, needs a manual rewrite, or has no equivalent and needs an application decision. Stored procedures, triggers, scheduled jobs, and ETL packages inventoried and estimated separately from the tables.
Phase 1: Target design.
Cluster topology and survival goals, region placement against your latency and data-residency obligations, primary key and index design that does not inherit the legacy hotspot pattern, and the deployment landing zone inside your own cloud account. Nothing migrates until the destination is real.
Phase 2: Schema conversion and pipeline rebuild.
Schema converted and reviewed object by object, with every conversion decision logged. ETL packages and scheduled jobs rebuilt as orchestrated pipelines. Application retry handling added where SERIALIZABLE isolation requires it. Automated regression suites generated from the legacy code so the target's behavior is tested against the source's, not against a specification nobody wrote down.
Phase 3: Rehearsed cutover.
Initial bulk load, then continuous replication from the source while both systems run in parallel. Row-level verification of table structure, column definitions, and data before traffic moves. Traffic stopped, consistency verified, failback enabled, then cutover. The legacy system stays intact and the failback path stays open until the new environment has proven itself.
Phase 4: Day-2 operations.
24/7 monitoring and incident response, schema evolution and index maintenance, performance tuning against agreed latency baselines, backup and disaster recovery, certificate and secret management, and cost governance so the savings do not erode in month six. All managed with the help of 35+ specialized AI management agents.
Stop splitting your database strategy between a migration vendor and an internal operations team. One accountable partner for the whole lifecycle, operating inside your infrastructure.
Single-region OLTP with no resilience requirement the current engine is failing to meet. Distributed SQL solves a problem you may not have.
Heavy analytical workloads that belong in a warehouse rather than in the operational database, whichever engine it runs on.
Schemas whose entire logic lives in procedural code, where the rewrite cost exceeds the value of the move and the honest answer is to modernize the application first.
Anything depending on unsupported features (range types, foreign data wrappers, session-scoped advisory locks) where the application cannot be changed.
Anything scheduled for decommission inside twelve months, where the migration cost never pays back.
Not everything belongs on distributed SQL
An assessment that recommends moving everything is probably a sales pitch. Workloads we routinely advise leaving where they are:
Done in production, not in a lab

A North American insurance-services firm. Three applications moved off SQL Server.
- 95 tables, 12 views, and 113 stored procedures converted
- 13 to 15 SSIS packages rebuilt as Airflow pipelines
- Every conversion decision captured in an audit log, which is what made human review of the converted objects tractable rather than open-ended
- The result was handed over as a permanent estate-management suite their operations team still runs against today
Who this is for
Running a CockroachDB migration in-house versus with Maxima
Category
In-house
Maxima
Schema conversion
Object-by-object discovery as the project runs; scope grows
Full object classification done by certified CrDB experts
Procedural code and ETL
Procedural code and ETL
Procedural code and ETL
Cutover risk
First rehearsal is the production cutover
Parallel run, row-level verification, failback path open until proven
Day 2 coverage
The migration team disperses; operations inherit an unfamiliar system
Same accountable team runs it, 24/7/365, follow-the-sun, supported by 35+ specialized AI management agents
Exit
Knowledge leaves with the contractors
Exit Guarantee: we write the everything and you keep all of it